Patrik's projects

A random smattering of ideas turned into reality

Menu

Skip to content
  • About
  • Sling Build Log
  • Sonex posts
  • Long-EZ Build Log
  • Motorcycle posts
  • KB1VGP

Archive of posts filed under the Workshop setup category.

Filament storage part 14

Posted by lutorm on 15 February 2021, 4:13 pm

It’s been a couple of weeks since the top of the filament storage box was completed. In the time since, I’ve been working on the bottom. The first thing that had to be done was to add a drain for the water from the dehumidifier. I did this by adding an aluminum hardpoint glued to …

Continue reading ‘Filament storage part 14’ »

Filed under Workshop setup | Comment

Filament storage part 13

Posted by lutorm on 28 December 2020, 8:21 am

With the sides of the box completed, it was time to glass the top. The layup itself was pretty straightforward, since it’s just a flat piece of glass that laps onto the sides and back. I added aluminum hardpoints for the screws that will hold the electronics enclosure and another hardpoint that can be used …

Continue reading ‘Filament storage part 13’ »

Filed under Workshop setup | Comment

Filament storage part 12

Posted by lutorm on 19 December 2020, 9:38 am

Since the last filament storage post, the storage tube assembly was microed into place. I covered the foam around the hole with duct tape to prevent getting micro on the foam surface, and poured slurry into the holes. The idea was to get enough slurry into the holes that it just filled all the empty …

Continue reading ‘Filament storage part 12’ »

Filed under Workshop setup | Comment

Filament storage part 11

Posted by lutorm on 13 December 2020, 1:14 pm

The work on the filament storage box has lately focused on what to do with the filament tubes when they’re not used. The box will fit up to 8 1kg rolls of filament (or 4 3.5kg rolls), and those filaments will exit the box in PTFE tubing through the bottom of the box so they …

Continue reading ‘Filament storage part 11’ »

Filed under Workshop setup | Comment

Filament storage part 10

Posted by lutorm on 14 November 2020, 8:54 pm

After 4 sides of the box were assembled, it was just the top left. This should have been quick but was delayed by the need to first bond the bracket that will hold the circulation fan to the inside surface. Had I designed the box today, with the intent to use the bed heater, I …

Continue reading ‘Filament storage part 10’ »

Filed under Workshop setup | Comment

Filament storage part 9

Posted by lutorm on 7 November 2020, 8:25 pm

After starting to assemble the filament storage box, I was distracted by the house fumigation and repairing the Flightradar24 antenna, but this weekend I finally had time to apply the corner tapes to the inside corners. This is pretty simple, the idea is to apply a strip of fiberglass cloth to join the two sides …

Continue reading ‘Filament storage part 9’ »

Filed under Workshop setup | Comment

Filament storage part 8

Posted by lutorm on 1 November 2020, 10:36 am

Progress on the filament dryer was stalled over the summer since all free time went into the repainting of the room. The next thing to do on the box itself was to figure out a way to mount the internal circulation fan, figure out how to run the wires, and assemble the panels into a …

Continue reading ‘Filament storage part 8’ »

Filed under Workshop setup | Comment

Filament storage part 7

Posted by lutorm on 17 May 2020, 1:48 pm

After designing the circuit board, I thought I would get back to glassing but nothing got done on that end before all the components and the circuit boards arrived. I’ve soldered surface-mount boards before using the “smear flux everywhere and touch the pins with the solder iron” method, which works but is pretty slow and …

Continue reading ‘Filament storage part 7’ »

Filed under Workshop setup | Comment

Filament storage part 6

Posted by lutorm on 12 April 2020, 10:42 am

Lately, the glass work on the physical box has been on pause since I realized I needed to work out what the connections to all the sensors is going to look like. To work out the electronics, I buckled down and started designing the circuit board. I had a vague notion of what it needed …

Continue reading ‘Filament storage part 6’ »

Filed under Workshop setup | 1 Comment

Filament storage part 5

Posted by lutorm on 28 March 2020, 9:34 pm

After glassing the cover for the dehumidification channel, I needed to mount the thermoelectric cooler. Small tasks are best now…. The hole fit pretty well, there’s a bit of clearance but I’ll seal this up with some silicone when mounting the cooler for real. On the outside, I had to drill and tap the holes …

Continue reading ‘Filament storage part 5’ »

Filed under Workshop setup | 1 Comment

Post navigation

« Older Entries
Newer Entries »

Recent Posts

  • Countersinking
  • The Dimpling Tool
  • Amateur building in Sweden
  • New workshop setup
  • Plane updates

Subscribe

Get notified of new posts. (This is a private list, your email will not end up with a commercial provider.)
Loading

Archives

Categories

  • Airplane
    • Long-EZ
      • Chapter 3
      • Workshop setup
    • Planning
    • Sling
      • Workshop setup
    • Sonex
  • Car
  • House
  • KB1VGP
  • Motorcycle
    • NC23
    • NC30
  • Uncategorized
  • Wine storage

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
© 2025 Patrik's projects
Powered by WordPress | Theme F2.