Basement “un-finishing” #4 – one down, two to go
It’s now been almost 4 months since the last episode of the basement “un-finishing”. We didn’t finish with coating the floor in the room that flooded because I wanted to finish the drainage first. Since that’s now functional, it was time to finish that up. After one more can of the EpoxyShield, the west room …
Continue reading ‘Basement “un-finishing” #4 – one down, two to go’ »