Patrik's projects

A random smattering of ideas turned into reality

Menu

Skip to content
  • About
  • Sling Build Log
  • Sonex posts
  • Long-EZ Build Log
  • Motorcycle posts
  • KB1VGP

Archive of posts filed under the Sling category.

Countersinking

Posted by lutorm on 13 December 2024, 2:55 am
Countersink tool

The last post talked about dimpling, bending the sheet metal to fit a countersunk rivet. Its larger sibling is countersinking, which is used when the metal is too thick to allow dimpling. Countersinking is done with a countersinking tool, basically a drill with the correct angle and a pilot that holds it in the correct …

Continue reading ‘Countersinking’ »

Filed under Sling, Workshop setup | Comment

The Dimpling Tool

Posted by lutorm on 8 August 2024, 12:21 am

Some of the rivets used to assemble the Sling are counter-sunk, that is, they have a flat head that is flush with the skin of the aircraft. This has the advantage of giving the aircraft a more smooth appearance and also improving the air flow over the surface. Having a smooth surface is most important …

Continue reading ‘The Dimpling Tool’ »

Filed under Sling, Workshop setup | 1 Comment

Amateur building in Sweden

Posted by lutorm on 7 August 2024, 9:58 am

Once it became clear that building was going to take place in Sweden, I had to start educating myself on the difference between homebuilding an aircraft in Sweden vs. in the U.S. The legal requirements in the U.S are amazingly minimal. As long as at least 51% of the tasks have been completed by people …

Continue reading ‘Amateur building in Sweden’ »

Filed under Sling | Comment

New workshop setup

Posted by lutorm on 4 August 2024, 9:39 am

Our new house has a very nice garage that measures 8.4m deep by 7.4m wide internally. This equates to a two-car garage with extra depth, not a ton of space. But because it was built to house machinery, it has 3.7m high ceilings and garage ports going up to that full height. As such, there’s …

Continue reading ‘New workshop setup’ »

Filed under Sling, Workshop setup | Comment

Plane updates

Posted by lutorm on 21 July 2024, 12:38 am

It’s now 12 years since I first posted about airplane building and announced that I was going to build a Long-Ez. Since then, our life situation has changed considerably, we’ve moved across the world, received kids, changed jobs, and no plane building whatsoever has taken place… Once we had one kid and were thinking about …

Continue reading ‘Plane updates’ »

Filed under Planning, Sling | Comment

Recent Posts

  • Countersinking
  • The Dimpling Tool
  • Amateur building in Sweden
  • New workshop setup
  • Plane updates

Subscribe

Get notified of new posts. (This is a private list, your email will not end up with a commercial provider.)
Loading

Archives

Categories

  • Airplane
    • Long-EZ
      • Chapter 3
      • Workshop setup
    • Planning
    • Sling
      • Workshop setup
    • Sonex
  • Car
  • House
  • KB1VGP
  • Motorcycle
    • NC23
    • NC30
  • Uncategorized
  • Wine storage

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
© 2025 Patrik's projects
Powered by WordPress | Theme F2.